Tau Kappa Epsilon - Iowa State University

Campaign Brochure

Epsilon Chapter of Tau Kappa Epsilon Fraternity at Iowa State University

Issue link: https://www.epageflip.net/i/935814

Contents of this Issue

Navigation

Page 7 of 11

T he Epsilon alumni and undergraduate leadership has developed a plan to address the long-term viability of the TKE experience on the Iowa State campus. rough careful study, assessment, and planning, it has been determined that updates and maintenance to the Chapter House are necessary, and the fraternity must invest in our home to meet the needs of today's students. Working with Accord Architecture, 224 Ash LLC has developed a tactical approach to our future. • Addition to the house resulting in an increase from 21,600 to 27,322 square feet. • Increase live-in capacity from 60 to 88 members by providing a variety of live-in options to promote privacy and community. • Provide ample study space, including areas for individual and group study, as well as improved wireless internet access throughout the facility. • Expand, renovate, and modernize bathrooms. • Expand dining/Chapter room to accommodate current Chapter membership. • Add steel fence with concrete base. • Double the endowment for scholarship programs to further the level and scope of scholarships, regardless of external economic factors. project highlights PROJECT COST Millard R. "Spike" Kratochvil Scholarship Fund $1,000,000 CONSTRUCTION COSTS General Conditions $364,245 (Includes Construction Contingency) Sitework and Demolition $136,605 Concrete and Footings $67,200 Masonry $63,210 Structural and Misc. Steel $25,830 Carpentry, Millwork, and Casework $385,140 Insulation and Moisture Protection $108,465 Doors and Windows $156,765 Finishes (Drywall, Paint, EIFS, Flooring) $252,525 Specialties (Toilet Accessories, Flagpoles, Signage, etc.) $47,355 Mechanical (Fire Sprinkler, HVAC, Plumbing) $620,760 Electrical $251,895 Basement Hallway Expansion $100,000 Owner Contingency $269,850 Non-Construction Costs $224,700 (A/E fees, testing, site survey, etc.) Furniture and Equipment $307,455 Subtotal $3,382,000 TOTAL $4,382,000 Above: Expanded ird-Level Bedroom; Right: Cold-Air Sleeping Group Sleeping Space Group Sleeping Space Existing Third Level Bedroom Expanded Dining/Chapter Room Existing ird-Level Bedroom Preliminary project costs are for discussion purposes only. 6

Articles in this issue

Archives of this issue

view archives of Tau Kappa Epsilon - Iowa State University - Campaign Brochure