Phase 1, Summer 2017
(Completed)
• First Floor Improvements (Additional 1,410 sq. .)
• House director's suite renovation, with addition of
kitchenette
• Main kitchen renovation with new pantry storage space
and expanded walk-in cooler and freezer space
• Aer-hours kitchen and serving area renovation
Phase 2, Aug. 2017-May 2018
• Second and ird Floors Addition (Additional 4,166 sq. .)
• Exterior deck on the second floor
• Nine new two-person bedrooms per floor for a total of 18
new bedrooms that will include a shared walk-in closet
• New commons area on the second and third floors to
serve as study and gathering space
• New bathrooms and laundry rooms on the second and
third floors
• Addition of covered parking spaces
Phase 3, Summer 2018
• Chapter room expansion to serve as both a study space and
chapter room (Additional 693 sq. .)
• Dining room expansion (Additional 693 sq. .)
• Redecoration of the first floor
• Installation of elevator with access from the lower level to the
second floor
• Fire egress stairwell installation with access from the first to
the third floor (Additional 204 sq. .)
• Widening of the east circle drive to accommodate more cars
Estimated Project Costs
Construction $4,800,000
Furnishings $600,000
Professional Fees $360,000
Total $5,760,000