5
HONORING
THE
PAST,
BUILDING
FOR
THE
NEXT
CENTURY
SECOND FLOOR THIRD FLOOR
ATTIC
Gut and renovate
the upstairs
hallways,
bedrooms, and
bathrooms.
Repurpose the
attic into several
bedrooms.
Install HVAC system
to provide climate
control from the
basement up to the
attic.
Paint and refurbish
the exterior,
replacing windows
Complete tuck-
pointing as needed
on all chimneys.
Redo the exterior
hardscape and
landscape of the
property.