Delta Upsilon - University of Illinois

Campaign Brochure

Illinois Chapter of Delta Upsilon Fraternity at the University of Illinois

Issue link: https://www.epageflip.net/i/1487372

Contents of this Issue

Navigation

Page 4 of 7

4 DELTA UPSILON - UNIVERSITY OF ILLINOIS Total Project Cost: $4 million Construction Timeline: May 2024-August 2025 A HOME TO SET DELTA UPSILON APART Our Plan to Enhance and Restore the House Recreate the original wooden staircase and grand entryway. Refurbish the first floor and dining room, replacing the old, decorative, coffered ceiling and reinstalling the wooden dining room doors. Bring back to classic form the living room, piano room, and alcove with refurbishment of the magnificent fireplace and cabinetry. Upgrade the kitchen and replace all existing equipment. Rebuild the front porch to original condition, enhancing the location of some of our fondest memories at Delta Upsilon. 1 2 3 4 5 2 3 4 5 1 FIRST FLOOR Scan here for more detailed plans and financial scenarios KITCHEN ALCOVE WOMEN MEN FOYER VESTIBULE DINING ROOM LIVING ROOM MAIL ROOM

Articles in this issue

Archives of this issue

view archives of Delta Upsilon - University of Illinois - Campaign Brochure