DELTA UPSILON 5 • Open up basement by increasing ceiling height. • Add a large, functional bathroom and a true social area. • Install state-of-the-art drainage system to eliminate chronic basement water issues. • Add new AC and heating to first floor and basement to replace aging steam system. New HVAC system will continuously dehumidify the basement. • Redo exterior hardscape and landscape of property to improve aesthetics and drainage. UP UP UP UP NEW STAIRS GUT ENTIRE BASEMENT BACK TO ORIGINAL MASONRY WALLS NEW GRAVITY PERIMETER UNDER DRAIN TIED INTO CITY STORM SEWER REMOVE EXISTING PARTITIONS AND "OPEN UP" ACTIVITY SPACES UNDER PIN EXISTING FOOTINGS AND INCREASE CEILING HEIGHT FROM 7'-6" TO 10'-0" NEW WEST WINDOWWELL OPENING UP 20 10 5 0 NORTH PROPOSED BASEMENT FLOOR PLAN 8/22/21 CHARLES D. BLECK, ARCHITECT PROPOSED BASEMENT PROPOSED FIRST FLOOR UP DN CL. DN UP UP DN OPEN MEN'S ROOM CLOSET RESTORED FRONT DOOR NEW VESTIBULE FLOOR FINISH RESTORED VERANDA EXISTING BASKETBALL COURT REDONE IN 2018 NEW FURNISHINGS AND DRAPERIES RESTORED CAUFFERED CEILING NEW LIGHTS AT FIREPLACE, RESTORE EXISTING LIMESTONE AND WOOD MANTLE AND SURROUNDS, NEW CABINETS NEW STEEL CABINETS AND NEW EQUIPMENT. INSTALL NEW MAKE UP AIR SYSTEM REFINISH HARDWOOD FLOORS REFINISH PANELED WAINSCOTING NEW CHANDELIERS TO REPLICATE ORIGINAL FIXTURES BEVERAGE CENTER REPLICATED NEW STAIR TO MATCH THE ORIGINAL GRAND STAIR CASE WITH THE ADDITION OF FIRE PROTECTION SPRINKLER SYSTEM THROUGHOUT THE ENTIRE BUILDING 20 10 5 0 PROPOSED FIRST FLOOR PLAN 8/22/21 CHARLES D. BLECK, ARCHITECT RELOCATED TROPHY CASE UPDATE WOMENS & MENS RESTROOMS • Refurbish first floor and dining room, including adding new windows, replacing the old decorative coffered ceiling, refinishing floors, reinstalling the old wooden dining room doors, and replacing furniture. • Refurbish magnificent fireplace and install new cabinetry to bring living room, piano room, and alcove back to classic form. • Refit kitchen with new equipment. Increase efficiency of storage, refrigeration, and ventilation system. • Rebuild front porch to original condition toenhane the location of some of our fondest memories at Delta Upsilon. PHASE II: (ESTIMATED COST $1,250,000) PHASE III: (ESTIMATED COST $850,000)