Delta Upsilon - University of Illinois

PCFS Brochure

Illinois Chapter of Delta Upsilon Fraternity at the University of Illinois

Issue link: https://www.epageflip.net/i/1406462

Contents of this Issue

Navigation

Page 4 of 11

4 ILLINOIS CHAPTER A HOME TO SET DELTA UPSILON APART PHASE I: (ESTIMATED COST $1,850,000) • Gut & rehab second and third floor rooms, bathrooms and hallways, including insulating exterior walls, insulating third floor ceilings, and install- ing new, energy efficient windows. • Add a modern, comfort-control, zoned AC and heating HVAC systems to second and third floors. • Replicate original, magnificent first floor staircase. ROOM 10 ROOM 9 ROOM 8 UP LOUNGE 5 HALL ROOM 7 ROOM 6 DN. ROOM 4 LOUNGE 5 ROOM 2 ROOM 3 ROOM 1 BATHROOM 20 10 5 0 NORTH PROPOSED SECOND FLOOR PLAN UPDATE EXISTING STAIRS COMPLETELY GUT AND REMODEL BATHROOMS WITH EPOXY OVERLAY MOISTURE BARRIER ON TOILET ROOMS WALLS, FLOORS AND CEILING REPLACE AND UPDATE ALL WINDOWS DN UP 8/22/21 CHARLES D. BLECK, ARCHITECT GUT ENTIRE FLOOR TO STUDS: INSTALL HIGH PERFORMING INSULATION ALL NEW CABINETS NEW CEILING FANS NEW ELEC. CIRCUITS & RECEPTACLE TO MEET DEMAND ALL NEW DOORS & FINISHES AIR CONDITION ALL ROOMS INSTALL HIGH SPEED WI-FI NEW RECESSED LED LIGHTING NEW LUXURY VINYL TILE ROOM 19 ROOM 21 ROOM 20 DN HALL ROOM 16 ROOM 18 ROOM 17 DN ROOM 14 ROOM 15 ROOM 12 ROOM 11 ROOM 13 BATHROOM UP UPDATE EXISTING STAIRS COMPLETELY GUT AND REMODEL BATHROOMS WITH EPOXY OVERLAY MOISTURE BARRIER ON TOILET ROOMS WALLS, FLOORS AND CEILING REPLACE AND UPDATE ALL WINDOWS GUT ENTIRE FLOOR TO STUDS: INSTALL HIGH PERFORMING INSULATION ALL NEW CABINETS NEW CEILING FANS NEW ELEC. CIRCUITS & RECEPTACLE TO MEET DEMAND ALL NEW DOORS & FINISHES AIR CONDITION ALL ROOMS INSTALL HIGH SPEED WI-FI NEW RECESSED LED LIGHTING NEW LUXURY VINYL TILE PROPOSED THIRD FLOOR PROPOSED SECOND FLOOR

Articles in this issue

Archives of this issue

view archives of Delta Upsilon - University of Illinois - PCFS Brochure