Sigma Chi - Montana State University

Campaign Brochure

Beta Rho Chapter of Sigma Chi Fraternity at Montana State University

Issue link: https://www.epageflip.net/i/769197

Contents of this Issue

Navigation

Page 8 of 11

COST Renovated and Modernized Beta Rho House – Completed by 2021 T he basement makeover will feature a re- vitalization of the chapter room to bet- ter suit ritual and meetings with more space. e brothers' rooms on the first floor will be more inviting with the same updates made on the second and third floors, ultimately creating a space our undergraduates want to live in—attracting and retaining more upper- classmen and leaders. New wiring, plumbing, HVAC, and structur- al upgrades throughout will round out the total renovation and create a safer Beta Rho house. Replacing all the windows will help offset the increasing cost of utilities in the fu- ture. An exterior renovation aimed at fixing gutter and siding issues and a re-leveling of the parking lot will improve curb appeal and reduce drainage problems. Basement/1st Level Competitiveness – $537,380 Updated Housing – $391,600 Bedrooms and Studies – $157,950 Kitchen Remodel – $68,800 Modernized HVAC and Dorm Circulation – $68,400 Bathroom Renovation – $96,450 Updated Finishes throughout – $145,780 Basement Finishes – $43,440 Main Level Finishes – $30,990 Upper Living and Library Finishes – $65,800 Stair Tower Finishes – $5,550 Sustainability – $290,400 Replace All Windows – $49,400 North at Dorm – $12,600 ($600/window, 21 windows) South at Dorm – $10,800 ($600/window, 18 windows) Dining/Upper Living – $14,000 ($1,000/window, 14 windows) Storefront Entry – $5,000 ($1,000/window, 5 windows) Elevator Tower – $7,000 ($1,000/window, 7 windows) Updated Mechanical and Plumbing – $241,000 Hydronic System – $120,000 New Ventilation – $50,000 Plumbing – $71,000 Safety and Accessibility – $495,595 Up to Code Electrical – $240,000 Fire Sprinklers – $84,000 ADA-Accessible Li – $70,020 (2) Stop Platform Lis – $15,200 Entrance and Li Enclosure – $25,050 V-1504 Platform Li – $26,920 (lump sum for the li) Platform Enclosure – $2,850 Exterior (replace siding, gutters, and resurface parking lot) – $50,940 Structural Upgrades – $41,635 Exterior – $26,270 Interior – $10,100 Building Code Compliance – $5,265 New Guardrails and Handrails – $9,000 Construction Subtotal – $1,323,375 Contingency – $198,506 (15% of construction total) Overhead and Profit – $198,506 (15% of construction total) Design Fees – $132,338 (10% of construction total) Total Cost to Renovate and Modernize House – $1,852,725 Professional Fees – $150,000 Total 2025 Vision Cost ~ $2,000,000

Articles in this issue

view archives of Sigma Chi - Montana State University - Campaign Brochure