FIRST FLOOR HIGHLIGHTS
• New solid wood entry door and surround frame with glass
sidelights to match historic entry
• New flooring with historic floor pattern throughout first floor
• New coffered, painted wood beam ceiling with recessed
tegular ceiling tiles, crown molding, and new LED lighting
throughout first floor
• New french doors in library and living room, along with new
column and beam treatment between rooms
• Resurface and paint walls
• Expanded library footprint
• New custom oak and glass bookcases and trophy case in
library
SECOND AND THIRD FLOOR HIGHLIGHTS
• Complete bathroom renovation with new toilets, sinks,
countertops, shower stalls, light fixtures, tile flooring, paint,
and ceilings
• Install new doors, door frames, and hardware
• New carpet tile, wall and ceiling paint, and rubber base in
suite living areas
• New LED lighting fixtures and window blinds throughout
• Installation of desk and bookshelves in dedicated study area
within each suite living area
1
9
27
2
0
1
7
A
L
E
G
E
N
D
A
R
Y
P
A
S
T
E
N
S
UR
I
N
G
O
U
R
F
U
T
U
R
E