6
NEW DORM
• Add a new two-story bedroom facility attached to the
north of the house with:
∙ irty-two individual bedrooms
∙ Six two-bed suites
∙ Country club-style bathrooms on each floor
∙ A study lounge and weight room in
connecting corridor
BARN UPDATES
• Refurbish barn to allow for year-round use
• Replace HVAC
• Add new lighting
• Install sound insulation
• Add new glass overhead doors
• Replace finishes
• Add new men's and women's bathrooms
• Create a built-in stage
• Install sound and light system
SITE IMPROVEMENTS
• Create a memorial garden to remember house
members lost
• Add a basketball court
• Secure rear property line access with fencing
MAIN HOUSE UPDATES
• Add new second floor with:
∙ Four two-bed suites and a shared lounge
∙ New chapter room with seating for 150+ members
∙ Study lounge
∙ Wraparound second-floor balcony
• Create new entry façade that offers a more
traditional exposure
• Replace glass wall at east of dining room and library
to create more visual appeal
• Open up front of house to create better flow
and circulation
• Rework interior finishes to create a more
traditional approach
• Rework ceiling of public rooms to accommodate
more and better lighting
• Reclaim wasted space in kitchen and rework
serving area
• Create 24/7 kitchen for aer-hours use
• Rework house director apartment
• Refurbish public bathroom to present more of a
powder room appearance
• Replace lighting
• Add new furniture
P R O J E C T
H I G H L I G H T S
E S T I M AT E D P R O J E C T C O S T
$ 5 M I L L I O N
MAIN HOUSE FLOOR 1
MAIN HOUSE FLOOR 2
BARN