PAGE 8 DELTA KAPPA EPSILON • PSI CHAPTER New balcony added above new main-floor patio. New lounge area for residents and guests. Timeline: The plan is for construction to be phased to keep residents in the house. Construction would start after the end of the fall 2023 semester and run through the summer of 2024. Estimated Total Project Cost: $5 million Estimated Fundraising Need: $3 million SECOND FLOOR 1 2 1 2