Psi Upsilon - Wesleyan University

Pre-Campaign Feasibility Study Brochure

Xi Chapter of Psi Upsilon at WesleyanUniversity

Issue link: https://www.epageflip.net/i/1483597

Contents of this Issue

Navigation

Page 4 of 7

THE XI CHAPTER 4 THE NEXT CHAPTER FOR THE XI T o ensure the future success of the Xi Chapter, we must endow the facility to cover deferred maintenance costs. While we have shaped the way our space can be cohabitated, we must update our facility to attract quality men and women. The Xi Chapter's William C. Kerr Leadership and Historic Preservation Society Corporation is developing a plan for the future. This plan will address the current issues that are afflicting the structure and ensure long-term viability of the Xi Chapter. Several joints need repointing, masonry needs cleaning, and light chains need reattached. Paint peeling and plaster deterioration in room B5. Mortar is missing and requires repointing. Mortar missing in brick vertical joints and arch end. HVAC upgrades are needed. Water intrusion from Pebble Beach.

Articles in this issue

Archives of this issue

view archives of Psi Upsilon - Wesleyan University - Pre-Campaign Feasibility Study Brochure