EXISTING RESTROOM
EPSILON IOTA CHAPTER | PAGE 6
BASEMENT
"Kappa Delta's home at 606 E.
Rollins is an important part of our
history. Every single brick, tile,
and nail represents another young
woman's life that is impacted by
Epsilon Iota. As other organizations
undergo housing updates, it warms my
heart to consider future generations will walk the same
halls we did, in an updated KD home they can be proud
of. Giving back to them in this very tangible way renews
my pride in Kappa Delta at MU. I'm honored to be part
of this campaign." –Susan Gowan Brooks '76, Honorary
Campaign Chairman
Complete rear addition with code-compliant fire
staircase, ADA elevator, entry foyer, and storage/
mechanical room.
1
1
Add new staircase to replace existing one with small
layout modifications to accommodate the change.
2
2
Renovate restroom to meet ADA requirements.
3
3
Add new flooring and updated interior LED
lighting throughout.
4
Replace heating and cooling, plumbing, and
electrical systems to accommodate the volume/
size of the house and address safety issues.
5
Address mandatory life-safety issues with fire
sprinklers and doors, and full compliance with
code specifications.
6
EXISTING STAIR
EXISTING
STUDY HALL
EXISTING
MECHANICAL/
STORAGE
EXISTING
CRAFT ROOM
EXISTING
EXISTING
EXISTING EXISTING
EXISTING LAUNDRY
ENTRY VESTIBULE
STORAGE
STAIR
ELEVATOR
4