BQP Beta Upsilon Chapter OuR Plan Continued Phase I – Main House Renovation Highlights Phase II – Annex Renovation Highlights • Complete renovation of the basement • New and improved educational space, potentially • All-new kitchen with designated dining area for 10-12 for including lab and fabrication, music room, and breakfast/snacks entrepreneur/venture area • Construct a full-size laundry room in basement • Complete review and update of mechanical, electrical and • Build a powder room under the main staircase to serve as plumbing systems restroom on main floor • New, fully equipped fitness room • Refinish all hardwood floors, clean and repaint the • Refinish all hardwood floors, clean and repaint the millwork, restore the historical light fixtures millwork, restore the historical light fixtures • Overhaul existing bathrooms with new fixtures and • Overhaul existing bathrooms with new fixtures and showers and made to be water-tight showers and made to be water-tight • Update fire safety systems (fire escapes, fire alarm • Update fire safety systems (fire escapes, fire alarm system, sprinkler system, etc.) system, sprinkler system, etc.) • Restore front façade (realign stone curbing, repaint • Exterior repairs include new front steps and walkway, windows, etc.) replace the front door and frame, and preserve the stone and • Develop a live-in advisor suite brickwork Project Estimate Renovations $2,000,000 Interest* $200,000 Campaign Expenses $200,000 Chapter Restart Costs $100,000 Total $2,500,000 * Campaign contributions will be collected over a period of five years. To complete the renovations in a timely manner, the Beta Upsilon Association will take out a loan through the Independent Residence Development Fund (IRDF) upon the commencement of each phase of the renovation project. As pledge payments are collected, payments will be made to the IRDF to eliminate the construction loans. The IRDF and the Beta Upsilon Association have an agreement in place for a Phase I loan with a fixed interest rate of 3%.

Articles in this issue

Archives of this issue

view archives of Beta Theta Pi - MIT - Centennial Campaign Brochure