PROPOSED SECOND FLOOR PLAN
UPDATE EXISTING STAIRS
COMPLETELY GUT AND REMODEL BATHROOMS
WITH EPOXY OVERLAY MOISTURE BARRIER ON
TOILET ROOMS WALLS, FLOORS AND CEILING
REPLACE AND UPDATE ALL WINDOWS
DN
UP
8/22/21 CHARLES D. BLECK, ARCHITECT
GUT ENTIRE FLOOR TO STUDS:
INSTALL HIGH PERFORMING INSULATION
ALL NEW CABINETS
NEW CEILING FANS
NEW ELEC. CIRCUITS & RECEPTACLE TO MEET DEMAND
ALL NEW DOORS & FINISHES
AIR CONDITION ALL ROOMS
INSTALL HIGH SPEED WI-FI
NEW RECESSED LED LIGHTING
NEW LUXURY VINYL TILE
ROOM 19
ROOM 21
ROOM 20
DN
HALL
ROOM 16
ROOM 18 ROOM 17
DN
ROOM 14
ROOM 15
ROOM 12
ROOM 11
ROOM 13
BATHROOM
PROPOSED THIRD FLOOR PLAN
NORTH
0 5 10 20
8/22/21 CHARLES D. BLECK, ARCHITECT
UP
UPDATE EXISTING STAIRS
COMPLETELY GUT AND REMODEL BATHROOMS
WITH EPOXY OVERLAY MOISTURE BARRIER ON
TOILET ROOMS WALLS, FLOORS AND CEILING
REPLACE AND UPDATE ALL WINDOWS
GUT ENTIRE FLOOR TO STUDS:
INSTALL HIGH PERFORMING INSULATION
ALL NEW CABINETS
NEW CEILING FANS
NEW ELEC. CIRCUITS & RECEPTACLE TO MEET DEMAND
ALL NEW DOORS & FINISHES
AIR CONDITION ALL ROOMS
INSTALL HIGH SPEED WI-FI
NEW RECESSED LED LIGHTING
NEW LUXURY VINYL TILE
PROPOSED THIRD FLOOR
PROPOSED SECOND FLOOR
PROJECTED
2nd and 3rd Floors:
Basement:
1st Floor:
Soft Costs:
Total Project Cost:
CONSTRUCTION
TIMELINE
15 months
May 2024 to