Construc on begins (Spring 2021)
Feasibility Study & Project Planning (February-July 2020)
OUR PLAN
• Build a two-story addi on on the south side of the
house to include:
• An expanded and updated dining room with
room for all members to eat formal meals, hold
mee ngs, and study.
• An expanded chapter room/study area with
room for all members and mul -purpose
func onality to accommodate chapter, Scandals/
University Sing prac ce,
individual and group study, and more.
• Expand the roofline and update the façade to
make it grander and increase the curb appeal.
• Expand basement so the en re membership
could be downstairs during storms and allow for
space to add a gym and common space.
• Rework space between dining room and house
director suite.
THE NEXT 100 YEARS
"Through Gamma Phi I've found the girls
that make me laugh, make me feel at home,
and make me a better person. From U-Sing to
watching movies in the carnation[room], I can't
imagine doing college without them!"
- Talin Propes '19
ESTIMATED COST: $2-3 Million
TIMELINE
Construc on would take place over the summer and
while the girls are living in the house with minimal disrup on.
2020 2021
"My sisters mean the absolute most to me because
they have not only taught me about myself, but how
to pour into others the way they pour into me.
At Gamma Phi, I know I'm home because
of the true and constant love I receive from
my sisters every day." - Katelyn Cambell '18