Pi Beta Phi - University of Georgia

Pre-Campaign Feasibility Study Brochure

Georgia Alpha Chapter of Pi Beta Phi at the University of Georgia

Issue link: https://www.epageflip.net/i/1052693

Contents of this Issue

Navigation

Page 7 of 11

Schemes - 01 and 02 - Front Exterior Elevation TOP PRIORITY PROJECTS UPDATE THE FRONT PORCH AND FAƇADE OF OUR HOME. Our goal is to create a more appealing and safer entrance to our Georgia Alpha home. By enhancing the columns, replacing the walkway and stairs and expanding the porch, we believe we can make our front entrance a stunning sight to welcome our sisters into 886 Milledge. ADDITION OF BACK STAIRWAYS AND DOORS. Return to having two internal back stairways to the house. Having only the front staircase has put a burden on the stairs, which has required repair and reinforcement for safety. We will also leverage having two back entrances, one with a handicap ramp. Scheme- 01 - Rear Exterior Elevation PAGE 6 FRONT BACK (without second story addition)

Articles in this issue

Archives of this issue

view archives of Pi Beta Phi - University of Georgia - Pre-Campaign Feasibility Study Brochure