5
LAMBDA CHI ALPHA
ALPHA-OMICRON
Project Highlights
General Enhancements
• Repair and replace plumbing and electrical systems to
accommodate the volume/size of the house and address any
safety issues
• Install a high-efficiency HVAC system to provide comfort for
our 70+ live-in members
• Make basic site and landscaping improvements to parking
lot, property lighting, and landscaping for structural
durability, security, and aesthetic appeal
• Improved wireless internet access throughout the facility
T
he Alpha-Omicron Zeta alumni and undergraduate leadership has developed a solid plan to address the long-term viability of the
Lambda Chi Alpha experience on the Indiana University campus. rough careful study, assessment, and planning, it has been
determined that updates and maintenance to the chapter house are necessary, and we must invest in our home to meet the needs
of today's students. Working with Rowland Design (Indianapolis), the house corporation has developed a tactical approach to our future.
Project Cost
As we move forward in this process, we will begin to
develop formal plans that can be presented for bidding. At
this time, we estimate that a project goal of $2 million will
achieve the goals and objectives that we have set.
UP
DINNING ROOM
SERVERY
UP
GALLERY
LAUNDRY
KITCHEN
CHAPTER
ROOM
STORAGE
MECHANICAL
GYM
UP
NIGHT
KITCHEN
DELIVERIES
LOWER LEVEL PLAN
STOR
PATIO
UP
STOR STOR
MEN
OPTION B
BIKE ROOM
80 SEATS
• NEW ADDITION -
Add dining and chapter
space on the lower level to
accommodate 200-plus men
• Redesign kitchen area to better
serve the chapter and its guests
• Expand the Pete Baker Bike
Room with an added service
door for easy in-out access for
team members and eliminate
the need for carrying bikes
upstairs and through the
main floor